Mooring Winches project began with the disassembly and inspection of the winches, followed by foundation repair and Rode Drum repairs.
The process began with the dismantling of parts followed by a dimension and run out check. A bore check is done on the impeller and a dimension check is done on the wear ring. Masking and blasting is then carried out, as well as coating.