MOORING WINCHES OVERHAULBack

Mooring Winches project began with the disassembly and inspection of the winches, followed by foundation repair and Rode Drum repairs.

INCOMING CONDITION (FWD STBD)

 The process began with the dismantling of parts followed by a dimension and run out check. A bore check is done on the impeller and a dimension check is done on the wear ring. Masking and blasting is then carried out, as well as coating.